The Model Builde Project for OpenTravel Object Suite has a year-end 2013 target completion time frame.
Inception: The Model Build Project followed a two-year study led by the Architecture Workgroup which culminated in the prototype 2.0 Candidate Release in April, 2013. After approval by the Architecture Workgroup, the Model Build project officially launched in September, 2013.
Challenge: Several companies (Marriott, Sabre and Amtrak) have already prototyped many of the messages and determined best practices. These best practices need to be reflected in the model that will allow the first generation of new message specifications to be generated.
Download the OpenTravel Code List Optimization Project Brief here: